need little help on this
going to set up 4 50 foot towers
already sold one
going to set 4 m-105 flatsides up in an array of some sort
how far apart do i have to set the towers
have plenty of acreage to do this also have a storage building can set in the middle then when i need to i can hook up all 4 beams to the mobile
any thoughts on this setup
the rotors are twister2 and only have 2 brake boxes
i already hooked all 4 rotors togetherto one box and all turn and brake at the same time
so will this work when set up on tower
going to set up 4 50 foot towers
already sold one
going to set 4 m-105 flatsides up in an array of some sort
how far apart do i have to set the towers
have plenty of acreage to do this also have a storage building can set in the middle then when i need to i can hook up all 4 beams to the mobile
any thoughts on this setup
the rotors are twister2 and only have 2 brake boxes
i already hooked all 4 rotors togetherto one box and all turn and brake at the same time
so will this work when set up on tower