In anticipation of an FCC Technological Advisory Council (TAC) investigation into changes and trends to the radio spectrum noise floor to determine if there is an increasing noise problem, ARRL asserted that such a study is long overdue. The FCC Office of Engineering and Technology (OET) announced plans for the TAC study in mid-June and invited comments and answers to questions that the TAC pos...
Continue reading...
Continue reading...