I dug the hole during the week. Secured the tilt base and section one of my new to me tower. A nice Craig's list find. Added some rebar and some pee gravel for drainage. Was going to mix concrete my self with 50 lb bags . And found that I needed 72 and a few extra. After digging the hole with help from my son he said just call the truck.
So I did. A yard later it's poured.
So I did. A yard later it's poured.