I am out laying my 150 run on Davis bury flex as we speak. Trench dug, end pvc in place. grounds sunk. Here is what I need. I am coming up about 20 ft to much line. ( must of had a shot or 2 when I measured) LOL.. I really do not want to cut and replace the connector at one end. SO the question is What would be the best way to spool ,coil what ever the remainder of the line? Should I leave the extra at the tower side or the shack side.. please advise..'